Bram-Cor provides complete design, engineering, construction, installation and start-up of new pharmaceutical facilities, even assisting the Clients through scouting activities of potential Know How Licensor, transferring the Know How, providing Validation Master Plans and Standard Operating Procedures, validating, aligning industrial processes to URS and regulatory requirements. We propose reliable turnkey know-how, engineering and services about: LVP (Large Volume Parenterals) in […]
Category: Site Installation
Site Installation – Pickling and Passivation
Posted on | By Bram-Cor Archive - Italy
Pickling and passivation processes, during the installation of a Bram-Cor Water Treatment System. Bram-Cor Water Treatment Equipment for pharmaceutical production lines: a full understanding of the drug production process is the key concept for correct design. Bram-Cor engineering focuses on fluid drugs sterile production processes, such a parenteral solutions, oral solutions, ophtalmic solutions. Bram-Cor work consists […]
PHOTO ARCHIVE
- Turnkey Project – Equipment Installation
- PS Production – Pure Steam Generator
- Pharmaceutical Engineering – 3D Design
- Processing – Ancillary Systems for Formulation and Preparation
- Purified Water (PW) & Water for Injection (WFI) – Reverse Osmosis Systems
- Pharmaceutical Conveyors and Turntables
- Processing – Mixing Tanks and Formulation Vessels
- Pharmaceutical Water Pretreatment Systems
- Pharmaceutical Loop and User points
- Pharmaceutical Linear Filling for Bottles
- Pharmaceutical Linear Filling for Bags
- Site Installation – Pickling and Passivation
- Water for Injection – Vapor compression Distillation systems
- Water for Injection – Multiple Effect Distillation systems
PHOTO ARCHIVE
- Turnkey Project – Equipment Installation
- PS Production – Pure Steam Generator
- Pharmaceutical Engineering – 3D Design
- Processing – Ancillary Systems for Formulation and Preparation
- Purified Water (PW) & Water for Injection (WFI) – Reverse Osmosis Systems
- Pharmaceutical Conveyors and Turntables
- Processing – Mixing Tanks and Formulation Vessels
- Pharmaceutical Water Pretreatment Systems
- Pharmaceutical Loop and User points
- Pharmaceutical Linear Filling for Bottles
- Pharmaceutical Linear Filling for Bags
- Site Installation – Pickling and Passivation
- Water for Injection – Vapor compression Distillation systems
- Water for Injection – Multiple Effect Distillation systems
PHOTO ARCHIVE
- Turnkey Project – Equipment Installation
- PS Production – Pure Steam Generator
- Pharmaceutical Engineering – 3D Design
- Processing – Ancillary Systems for Formulation and Preparation
- Purified Water (PW) & Water for Injection (WFI) – Reverse Osmosis Systems
- Pharmaceutical Conveyors and Turntables
- Processing – Mixing Tanks and Formulation Vessels
- Pharmaceutical Water Pretreatment Systems
- Pharmaceutical Loop and User points
- Pharmaceutical Linear Filling for Bottles
- Pharmaceutical Linear Filling for Bags
- Site Installation – Pickling and Passivation
- Water for Injection – Vapor compression Distillation systems
- Water for Injection – Multiple Effect Distillation systems
ALBUM RESEARCH
- Complete Lines & Plants (14)
- cGMP construction (3)
- GAMP "V" Model (1)
- Project Drivers (11)
- Filling and Packaging System (3)
- Installation Services (3)
- Loop Distribution Systems (1)
- Pharmaceutical Equipment (2)
- Pharmaceutical Plant (4)
- Pharmaceutical Processing (5)
- Pharmaceutical Turnkey Project (1)
- Pharmaceutical User Point (1)
- Water Pretreatment Systems (2)
- Water Treatment Systems (6)
- WFI – Water For Injection (3)
